KINGSTON UPON THAMES

General Building Contract

Residential Loft Conversion and Extension.

The property was converted up top and extended out the back. This meant that we refurbished the areas of the house that were affected during the build. We also ensured that all liveable areas of the house, that were not part of the construction area, were sealed off and protected. At each interval during the build, we invited the client to inspect the work, from fitting the insulation properly, to ensuring the right adhesive was used during the tiling. We wanted to ensure the client that no corners were being cut. This is something that we do on all of our jobs. 

 

Leonid completed a loft conversion and ground floor extension (rear and side return) in 2015. The work was done to an extremely high quality, was done meticulously and promptly, and there was a good level of communication throughout the build. Leonid is very practical, able to deal with unforeseen issues (offering good solutions) and flexible. Snagging issues were dealt with promptly, along with warranty issues. The extension has stood the test of time and 3.5 years on we continue to be delighted with the work he did for us. I’d be very happy to expand on this further on the phone.

Andy

 

SILVER BLAZE CONSTRUCTION

07748641827

Wimbledon, London, UK

  • Instagram
  • Facebook
  • Twitter
  • YouTube
  • LinkedIn

©2017 | Silver Blaze Ltd