THAMES DITTON

General Building Contract

2 fully refurbished residential bathrooms.
Both bathrooms were fully stripped out at the same time as there were other bathrooms in the house that could be used during the project. 
Once the bathrooms had been stripped out, all the first fix electrics and plumbing took place, along with any structural amendments that needed to happen. 
The bathrooms were then plastered and decorated to the client's specification. Once the 2nd fixes for electrics and plumbing had been completed, we tiled the floors and walls.
The snagging and finishing touches brought the project to an end.

 

Thank you to everyone at Silver Blaze for creating our two new bathrooms.